Dudullu (Istanbul Metro)

Coordinates: 41°01′17″N 29°09′43″E / 41.021398°N 29.162036°E / 41.021398; 29.162036
From Wikipedia, the free encyclopedia
Dudullu
Istanbul Metro
Istanbul Metro rapid transit station
M5 platform featuring half-height protective gates
General information
LocationYukarı Dudullu Neighborhood, Alemdağ Street, 34775
Ümraniye, Istanbul, Turkey
Coordinates41°01′17″N 29°09′43″E / 41.021398°N 29.162036°E / 41.021398; 29.162036
Owned byIstanbul Metropolitan Municipality
Operated byMetro Istanbul
Line(s)Line M5 M5
Line M8 M8
Platforms2 island platforms (1 for each line)
Tracks4
Construction
Structure typeUnderground
Parking81 spaces
Bicycle facilitiesYes
AccessibleYes
History
OpenedM5: 21 October 2018; 5 years ago (2018-10-21)
M8: 6 January 2023; 16 months ago (2023-01-06)
Electrified1,500 V DC Overhead line
Services
Preceding station Istanbul Metro Following station
İmam Hatip Lisesi
towards Üsküdar
M5 Line Necip Fazıl
MODOKO–KEYAP
towards Bostancı
M8 Line Huzur
towards Parseller

Dudullu is an underground station on the M5 and M8 lines of the Istanbul Metro in Ümraniye.[1][2] The station is located on Alemdağ Street in the Yukarı Dudullu neighborhood of Ümraniye. Connection to IETT city buses is available at street level.

Both M5 and M8 lines operate as fully automatic unattended train operation (UTO). Both stations consist of an island platform with two tracks. Since the M5 and M8 are ATO lines, protective gates on each side of the platform open only when a train is in the station on M5, and full height doors are used for M8.

The platform of the M8 line is under the platform of the M5 line.

The M5 portion of the station was opened on 21 October 2018,[3] with the M8 portion opening on 6 January 2023.[4]

Station layout[edit]

The station has 2 exits. There are 3 elevators and 18 escalators.

Platform level Westbound Line M5 toward Üsküdar (İmam Hatip Lisesi)
Island platform, doors will open on the left
Eastbound Line M5 toward Samandıra Merkez (Necip Fazıl)
Platform level Southbound Line M8 toward Bostancı (MODOKO–KEYAP)
Island platform, doors will open on the left
Northbound Line M8 toward Parseller (Huzur)

Gallery[edit]

References[edit]

  1. ^ "Üsküdar-Çekmeköy Metro Hattı". www.metro.istanbul. Retrieved 2021-01-29.
  2. ^ "Bostancı-Dudullu-Parseller Metro Hattı". www.metro.istanbul (in Turkish). Retrieved 2024-02-13.
  3. ^ Gazetesi, Dünya (2018-10-21). "Sürücüsüz metronun ikinci etabı açılıyor". Archived from the original on 2018-10-21. Retrieved 2021-01-29.
  4. ^ "M8 Bostancı-Dudullu Metro Hattı İşletmeye Açılmıştır". www.metro.istanbul (in Turkish). Retrieved 2024-02-13.

External links[edit]